Nobu Hotel, Portman Square – London
Technical Arts were chosen by L+R as consultants to oversee the audio and video design and implementation for the entire hotel, ensuring that the finished result met Nobu’s i
Hard Rock Hotel – Prague
Construction of the hotel started on site in September 2019 and the hotel is due to open in the autumn of 2022. It promises to be quite a party!
Glaziers Hall – London Bridge, London
Glazier's Hall is a premier event venue in London Bridge, Technical Arts were asked to design and install lighting and audio solutions to accompany the refurbishments. The result i
Butlin’s – Bognor Regis, England
Technical Arts were first approached by Bourne Leisure in February of 2018 in order to help them define and develop their requirements for a permanently installed audio system for
St. Paul’s School – Barnes, London
Technical Arts provided distributed and zoned audio throughout St. Paul's School in South London. The end result was not only in-keeping with the overall design but also aesthetica
Copper House – Berkhamsted, England
Copper House - a glamorous bar, restaurant and lounge provided with lighting and audio by Technical Arts with respect for the Grade II listing of the building and the client's desi
Victoria Gate Casino – Leeds, England
After three years of working alongside Leeds' interior design and architecture firm, Fuse Studios, the Victoria Gate Casino was finally completed. Spanning three floors, the design