St. Paul’s School – Barnes, London

,

Technical Arts were employed by DES Electrical to offer expert input on the supply and delivery of distributed audio systems for the Phase I development.

We were required to work in partnership with DES Electrical, and the wider client team to ensure not only compliance with the design, but a robust and aesthetically considered end result.

Distributed and zoned audio was provided over three floors in all general promenade areas, classrooms and administration/teaching support areas.

Additional performance systems were also provided in the multi-purpose Dining Hall and the Library.

Paging and class change systems were integrated into the new build via a pre-existing IP based site wide network.

Having achieved a snag free handover for Phase I of the scheme, Technical Arts have been retained to deliver Phase II due for completion in September 2019.

Victoria Gate Casino – Leeds, England

, , , ,

Technical Arts have just completed the lighting scheme at the stunning Victoria Gate Casino in Leeds.  A project, which for us has now spanned three years, is finally complete and was certainly worth the wait.

IMG_6582

The interior scheme by Leeds based Interior Designers, Fuse Studios, is perfectly complemented by our lighting scheme.  The combined efforts of Fuse Studios and Technical Arts have created individually styled intimate areas within the vast floor area which spans three floors.  The casino has 2 bars, a restaurant, stage, two gaming floors, poker room to name but a few of the delights within.

The casino has just opened to rave reviews and the client’s are delighted with the result.